King Henry VIII College Malaysia ELV System Integration Project
ELV system integration project for King Henry VIII College Malaysia, covering network infrastructure, security systems, integrated wiring, and system integration to support campus operations.
Location
Selangor, Malaysia
Duration
Oct 2016 – Jan 2017
Team Size
150+ Personnel
Scope of Work
ELV system integration project for King Henry VIII College Malaysia
Installation of computer network system, security monitoring system and gate control system
Installation, configuration, and integration of the computer network infrastructure, security monitoring (CCTV), and gate control systems to ensure secure, reliable connectivity and controlled access across the premises.
24x7x4 on-site support project management
Provision of round-the-clock on-site technical support with a four-hour response time, including system monitoring, fault rectification, coordination of works, and overall project management to ensure continuous system availability and smooth operations.